我们的方法

拥有99.8%的可靠性和99%的平均可用性我们的技术和团队拥有支持LNG项目所需的内容



LNG图像1

我们已经致力于液化天然气30多年

There are currently 45 LNG plants in operation or under construction around the world that rely on our turbomachinery—which drives over 350 MTPA of global installed LNG capacity. We're the most referenced OEM for large gas turbines on main refrigerants.

LNG图像2

A history of industry firsts

In 1989 at Woodside: first to use a gas turbine train for LNG. In 2008 at Qatargas: five simultaneous major overhauls that cut outage time in half. In 2017 for Petronas: core machinery for the first floating liquefied natural gas (FLNG) facility. In 2019 for Freeport: first to use large motors for e-LNG.

LNG图像3.

我们的解决方案不断增加了规模经济

Our 7.8 MTPA trains for Qatargas 2 were the world's largest in 2009. In 2018, we took FLNG to new heights after just two years, with 3.6 MTPA capacity on Prelude. And, we installed three electric LNG trains with a combined capacity of 13 MTPA at Freeport in 2019.







Our expertise

Supporting 450+ million tons of capacity







精选视频

LM9000 Aeroderivative Gas Turbine—ideal for LNG mechanical drive