A high-producing, offshore Norwegian oil well was shut in for two years because deposits and sand in the wellbore had caused a failed intervention. This stranded 72 ft (22 m) of tool string (consisting of a production logging tool [PLT] and a dual e-line tractor) and approximately 1,150 ft (350 m) of seven conductor cable.
The length of the fish and lubricator height precluded live well operations or any hydrocarbon returns to surface. After multiple retrieval attempts had failed, the operator contacted Baker Hughes, who recommended the TeleCoil intelligent coiled tubing (CT) service.